Watch two moving
9-11-2001 tributes




QViS Lite and QViS Professional Feature List

General

Print, Print Preview, Print Options - batch print, hierarchy scope

Search And Replace

Activity Resources

Diagram Go-to Links

Diagram Links List

 

Diagram Display Settings

Auto Align

Diagram and Activity Type

 

Reset Child and Activity ID Numbers

Auto Create Child

Auto Generate Diagram

Fill Settings, color, line fills, image fill, and gradient fill

Box Settings - rounded corners, ellipse, shadows

Line Settings - color, border width

Activity Constraints

Position Lock Diagram Items

Double Click Action

Space Apart and Align Link Lines

Link Line Flow Text

Organizational Chart Lines

Copy Apply Style and Copy As Default Style

Link Line Arrow Settings

Drag and Drop Customizable Toolbars and Main Menu

Recycle Trash Facility

Files

File Management

Image Management

 

Import/Export Diagram and child hierarchy

Group Hierarchy View

Project Templates and Instances, Instance List

 

Attachments

Activity and Diagram Application Attachment

Application Attachments List

 

Attachment Management

 

Application Attachment to Activities

Activity Application Attachment Templates and Instances

 

Documents List

 

Attach Diagram Links to Activities

 

Spell Checker

Character Case Setter

Create Icon

 

Snap Grid

Parent Child Integrity

Document Attachments

Image Attachments

 

Document Control

Control Information - diagram reference, authorized and prepared by, version number and prepared by date, and issue manager

Log Changes

Abbreviations Library

References Library

Resources Library

 

Attach Notes to Diagrams

Export and Import Libraries

Update Libraries from Diagrams

Master Control List

Change Control Option for Projects

 

Change Notification

 

Costing

Resource Analysis

 

Gantt Chart

 

Activity Check List

 

Value Added Analysis

 

Process Duration, Cost and Probability.

 

Path and Case Analysis, Critical Path Analysis

 

Relative Costing and Duration

 

Start and Finish Dates and Times and calculate activity dates and times across a process and hierarchy

 

Scenarios

 

Activity Cost - static, calculated or addition of both, calculate from child diagram or hierarchy

 

Activity and Diagram Date Time with calculate across process or child hierarchy

 

Activity Completed Setting

 

Display Activity Costing Values on top of each activity

 

Link Line Input Logic

 

Process head count

 

Process man hours

 

Communication

Attach Memos to Diagrams

 

Memos List

 

Mail and External Mail and User Groups

 

Alarms

 

Message Routing

 

Security

Passwords and edit rights, logon, prevents diagrams being edited by more than one user at the same time

Automatic Backup

Protected Active Directories

 

Override User Rights for Diagrams

 

View Logged On Users

 


To download this comparison sheet Click here

 


We want to be your preferred service provider for the lifetime of your JDE system.

 
 
 

  © Copyright 2002-2008 by Enterprise Solutions Inc. All rights reserved.